Ecosystems Indicators Workflows Project

Project overview, work packages and deliverables

Motivation

ARC Industry Laureate research fellowship

Goal: build Australian capacity for implementing a nature positive agenda

flowchart LR
    subgraph IN["Industry needs"]
        IN1["<p style='width:240px; text-align:left; margin:0px;'><b>Policy drivers</b>
<br>- Nature Positive Plan
<br>- Global Biodiversity Framework
<br>- Federal & state laws & policy
<br>- Business & community activity</p>"]:::INClass
    end
    subgraph LD["Laureate deliverables"]
        D1["<p style='width:250px; text-align:left; margin:0px;'><b>1. Foundational data streams</b>
<br>- National Ecosystem Inventory
<br>- Threats & time series data</p>"]:::DClass
        D2["<p style='width:250px; text-align:left; margin:0px;'><b>2. Training and development</b>
<br>- Reference resources & tools
<br>- Direct learning activities<br>&nbsp;&nbsp;(workshops & e-courses)</p>"]:::DClass
        D3["<p style='width:250px; text-align:left; margin:0px;'><b>3. Applications &<br>proof of concept</b>
<br>- National risk assessments<br>for priority ecosystem themes</p>"]:::DClass
    end
    subgraph PIS["Pathways to Impact"]
    direction LR
    PI1["Australian leadership &<br> global Influence"]:::PIClass2
    PI2["<p style='width:200px; text-align:left; margin:0px;'><b>Implementing action</b>
<br>A Protected areas
<br>B Statutory listings of TEC
<br>C Regional planning
<br>D Regulatory functions
<br>E Ecosystem management
<br>F Conservation programs
<br>G Climate adapatation
<br>H Monitoring & reporting
<br>I Restoration investments</p>"]:::PIClass2
    end
    PIS:::Empty
    LD:::Empty
    IN:::Empty
    K1{{Key<br>capacity<br>needs}}:::Key
    K2{{Industry<br>Transformation}}:::Key
    IN1 --> K1 -->D1 & D2 & D3 --> K2 --> PIS
    classDef Key fill:none, stroke-width:4px, font-weight: bold;
    classDef PIClass2 fill:#ECECBB;
    classDef INClass fill:#96DAE4;
    classDef DClass fill:#CDEEAA;
    classDef Empty fill:none, stroke-width:4px, font-weight: bold, font-size: large;

ARDC (2025)

Australia’s diverse ecosystems require tailored indicators for monitoring, assessment, and management.

TF1.6 Boreal, temperate and montane peat bogs, e.g. Alpine bogs in Tasmania.

Approaching Lake Bill

G Conceptual Ecosystem Model clusterBio Alpine Sphagnum bogs AE1 Water AE3 Peat AE1->AE3 CB1 Sphagnum moss AE1->CB1 CB2 Fauna (frogs, etc) AE1->CB2 AP2 Precipitation AP2->AE1 AP4 Fire AP4->CB1 TR2 Alien ungulates TR2->AE3 TR3 Pathogens TR3->CB1 TR4 Alien plants TR4->CB2 TR5 Infrastructure TR5->AE3 TR6 Climate change TR6->AP2 TR6->AP4 BP1 Evapo- transpiration TR6->BP1 BP1->AE1 CB1->AE3 CB1->CB2

F2.5 Ephemeral freshwater lakes, e.g. Menindee Lakes, Lake Cowal, Peery Lake, etc.

A system of ephemeral, freshwater lakes which are fed by overflow of the Darling River in Australia

Key processes: Water volume-chemistry interactions & trophic web, river inflows

Key threats: Water extraction, water pollution, eutrophication, climate change

M1.1 Seagrass meadows, e.g. Shark Bay in Western Australia

Dugong near Marsa Alam, Egypt

Key processes: Interactions & trophic web, low-energy waves vs. storms

Key threats: Sedimentation, eutrophication, climate change

T2.5 Temperate pyric humid forest: Alpine Ash forests, Jillaga ash, Blue mnts ash, White ash forests, …

Mountain Ash of the Black Spur Drive

Key processes: Vegetation-fire feedbacks, trees as foundation spp for other biota & functions

Key threats: Logging & fire regime shift, climate change

T1.1 Tropical-subtropical lowland rainforest, e.g. Gondwana rainforests, warm temperate rainforests, …

Gondwana rainforest at Dorrigo National Park (6611254443)

Key processes: Trophic web, gap dynamics, microclimate feedbacks, foundation species

Key threats: Climate change, fire regime shifts, invasive species, logging legacies

T5.1 Semi-desert steppe: Chenopod shrublands, Bluebush sandplains, Hay plain, Stony downs

Key processes: Climate variability, herbivory & trophic regulation

Key threats: Soil degradation, nutrient flux, land use change

Project overview

Why this project?

Bottleneck in scaling indicator development across Australia’s diverse ecosystems.

🚨 Existing approaches

  • Generic indicators
  • Fragmented, ad‑hoc analytical methods
  • Limited scalability & poor reproducibility
  • Lack of reusable tools & documentation
  • Hard to develop indicators consistently across ecosystems

🧰 Our Response

Reproducible workflows for fit-for-purpose ecosystem‑specific indicators.

🔧 What We’re Building

  • Modular, transparent, reproducible workflows
  • Guided examples for all skill levels
  • Shared standards: FAIR data, vocabularies & interoperability
  • A community of practice for collaboration & skill sharing

G Conceptual Ecosystem Model clusterBio Alpine Sphagnum bogs AE1 Water AE3 Peat AE1->AE3 CB1 Sphagnum moss AE1->CB1 CB2 Fauna (frogs, etc) AE1->CB2 AP2 Precipitation AP2->AE1 AP4 Fire AP4->CB1 TR2 Alien ungulates TR2->AE3 TR3 Pathogens TR3->CB1 TR4 Alien plants TR4->CB2 TR5 Infrastructure TR5->AE3 TR6 Climate change TR6->AP2 TR6->AP4 BP1 Evapo- transpiration TR6->BP1 BP1->AE1 CB1->AE3 CB1->CB2

G Indicator development for subcriterion C1: Aridity Index cluster_uncertainty Uncertainty cluster_CHELSA Data source: CHELSA Version 2.1 cluster_RS Relative Severity & Extent of Decline cluster_prep Data preparation PREC Precipitation [mm/month] Raster, 30 arc-sec Time series 1979 – 2019 Monthly values ECO_PREC Precipitation [mm/month] Mean values Time series 1979 – 2019 Monthly values PREC->ECO_PREC extract and aggregate per polygon PET PET (Penman) [mm/month] Raster, 30 arc-sec Time series 1979 – 2019 Monthly values ECO_PET PET (Penman) [mm/month] Mean values Time series 1979 – 2019 Monthly values PET->ECO_PET extract and aggregate per polygon ANNUAL_PREC Annual Precipitation [mm/year] Data frame: polygon X year ECO_PREC->ANNUAL_PREC aggregate per year ANNUAL_PET Annual PET [mm/year] Data frame: polygon X year ECO_PET->ANNUAL_PET aggregate per year AI_CHELSA Aridity Index AI=PREC/PET Data frame: polygon X year ANNUAL_PREC->AI_CHELSA ANNUAL_PET->AI_CHELSA AI_smooth Smooth AI trend Linear model Per polygon Predict RS for 2024 AI_CHELSA->AI_smooth Threshold Threshold (CT): Years 2000-2002 Lower quantile of AI across polygons AI_CHELSA->Threshold ED Cummulative Extent of decline weighted formula RS Relative severity RS=(FV-IV)/(CT-IV) Per polygon ED->RS THR CT selection ED->THR SIZE Area of occurrences ED->SIZE TIME Annual variation RS->TIME RS->THR IV Initial value (IV): predicted AI 1975 AI_smooth->IV FV Final values (FV): predicted AI 2024 AI_smooth->FV Threshold->RS IV->RS FV->RS PRED Future projection 95% pred. interval

G Conceptual Ecosystem Model clusterBio Peatland ecosystem AE1 Water AE3 Peat AE1->AE3 CB1 ... AE1->CB1 CB2 ... AE1->CB2 AP2 Precipitation AP2->AE1 AP4 Other processes AP4->CB1 TR2 Other threats TR2->AE3 TR3 Other threats TR3->CB1 TR4 Other threats TR4->CB2 TR5 Other threats TR5->AE3 TR6 Climate change TR6->AP2 TR6->AP4 BP1 Evapo- transpiration TR6->BP1 BP1->AE1 CB1->AE3 CB1->CB2

Same as before

New results in same format

Transparent and reproducible

flowchart LR
    IND1>"Indicator 1"]:::WPtodo
    IND2>"Indicator 2"]:::WPtodo
    %%IND3>"Indicator 3"]:::WPtodo
    %%IND4>"Indicator 4"]:::WPtodo
    PLAT1[["Alpine bogs<br>assessment"]]:::WPtodo
    %%PLAT2[["Status of<br>Australian<br>peatlands"]]:::WPtodo
    WF1{WF1}:::WF
    WF2{WF2}:::WF
    %%WF1b{WF2*}:::WF
    ECO1(["Alpine<br>bogs"]):::Ecos
    %%ECO2(["Fleurieu<br>swamp"]):::Ecos
    %%ECO3(["other<br>peatlands"]):::Ecos
    RGA{{"Researcher<br>group A"}}:::RoleCore
    %%RGB{{"Researcher<br>group B"}}:::RoleCore
    RL4(("End Users<br>(state)")):::RoleExt
    %%RL6(("End Users<br>(national)")):::RoleExt
    
    RGA --> ECO1 --> WF1 --> IND1 --> PLAT1
    ECO1 --> WF2 --> IND2 --> PLAT1 
    %%WF2 -.-> WF1b
    %%RGB --> ECO2 & ECO3 --> WF1b --> IND3 & IND4 --> PLAT2
    %%PLAT2 --> RL6
    PLAT1 --> RL4
    classDef WPtodo fill:white,stroke:#E51875,color:#E51875, stroke-width:4px
    classDef WF fill:#E51875,stroke:#E51875,color:white, stroke-width:4px
    classDef Ecos fill:#dfd,stroke:#040,color:#040, stroke-width:2px
    classDef RoleExt fill:#fff,stroke:#8E489B,color:#8E489B, stroke-width:2px
    classDef RoleCore fill:white,stroke:#00B0D5,color:black, stroke-width:4px

  • FAIR methods and datasets
  • Update outputs with new data

Scale Up

flowchart LR
    IND1>"Indicator 1"]:::WPtodo
    IND2>"Indicator 2"]:::WPtodo
    IND3>"Indicator 2<br>Fleurieu swamp"]:::WPtodo
    IND4>"Indicator 2<br>other peatlands"]:::WPtodo
    PLAT1[["Alpine bogs<br>assessment"]]:::WPtodo
    PLAT2[["Status of<br>Australian<br>peatlands"]]:::WPtodo
    WF1{WF1}:::WF
    WF2{WF2}:::WF
    WF1b{WF2*}:::WF
    ECO1(["Alpine<br>bogs"]):::Ecos
    ECO2(["Fleurieu<br>swamp"]):::Ecos
    ECO3(["other<br>peatlands"]):::Ecos
    RGA{{"Researcher<br>group A"}}:::RoleCore
    RGB{{"Researcher<br>group B"}}:::RoleCore
    RL4(("End Users<br>(state)")):::RoleExt
    RL6(("End Users<br>(national)")):::RoleExt
    
    RGA --> ECO1 --> WF1 --> IND1 --> PLAT1
    ECO1 --> WF2 --> IND2 --> PLAT1 & PLAT2
    WF2 -.-> WF1b
    RGB --> ECO2 & ECO3 --> WF1b --> IND3 & IND4 --> PLAT2
    PLAT2 --> RL6
    PLAT1 --> RL4
    classDef WPtodo fill:white,stroke:#E51875,color:#E51875, stroke-width:4px
    classDef WF fill:#E51875,stroke:#E51875,color:white, stroke-width:4px
    classDef Ecos fill:#dfd,stroke:#040,color:#040, stroke-width:2px
    classDef RoleExt fill:#fff,stroke:#8E489B,color:#8E489B, stroke-width:2px
    classDef RoleCore fill:white,stroke:#00B0D5,color:black, stroke-width:4px

Aims & Impacts

Aims & Impacts

A framework for developing fit-for-purpose ecosystem-specific indicators

  • Design modular, transparent, and reproducible workflow adaptable to:
    • Different datasets
    • Ecosystem types
    • Policy and reporting needs

Transparent, defensible, scientifically rigorous indicators

Aims & Impacts

A community of practice for collaboration & skill sharing

  • Support users with different expertise through guided examples.
  • Foster a community of practice for collaboration and co‑development.

Increase capacity and empower the user community

Aims & Impacts

Accelerate development of fit-for-purpose ecosystem-specific indicators.

  • Enable scalable, adaptable ecosystem-specific indicator development.
  • Track progress across hierarchical levels of ecosystem classification.

Scalable systems supporting national environmental reporting and actionable insights for decision‑making.

Outcomes and beneficiaries

📦 Outcomes

🧩 Core Deliverables

  • Modular workflow toolbox
  • Scalable, adaptable indicator workflows
  • FAIR analysis‑ready datasets
  • Interoperable tools aligned to shared vocabularies
  • A connected and empowered user community

👥 Beneficiaries

  • Researchers: Increased opportunities and alignment with national and international initiatives.
  • Ecologists & conservation managers: Access to reports supporting monitoring, assessment, management.
  • Researchers & government agencies: Integrated data + reproducible methods for policy, restoration, reporting.
  • Programmers with ecosystem knowledge: Contribute to co-design, enable innovation.
  • Students & early‑career professionals: Skill development in reproducible science, modelling, workflow design.

Work packages

Overview of Work packages

flowchart LR
    WP1["WP1: Establishment"]:::WPtodo
    WP2["WP2: Requirements & planning"]:::WPtodo
    WP3["WP3: Data & Metadata<br>(and tools)"]:::WPtodo
    WP4["WP4: Workflow delivery"]:::WPtodo
    WP5["WP5: Catalogue & dashboard"]:::WPtodo
    WP6["WP6: Community building"]:::WPtodo
    RL1{{"Data<br>Scientists"}}:::RoleCore
    RL2{{"Research<br>software<br>team"}}:::RoleCore
    RL3{{"Community<br>Engagement"}}:::RoleCore
    RL4(("Additional<br>Partners")):::RoleExt
    RL5{{"Research<br>Expertise"}}:::RoleCore
    RL6(("End-user<br>Community")):::RoleExt
    RL7(("Larger<br>Research<br>Community")):::RoleExt
    WP1 --> RL1 & RL2 & RL3 & RL5
    RL1 --> WP4 --> WP5
    RL1 & RL2 --> WP2 --> WP3 & WP4
    RL2 --> WP3 --> WP4
    RL4 -.-> WP3
    RL3 & RL5 --> WP6 --> RL7 --> WP4
    WP1 & WP6 -.-> RL6 --> WP5
    classDef WPtodo fill:white,stroke:#E51875,color:#E51875, stroke-width:4px
    classDef RoleExt fill:#fff,stroke:#8E489B,color:#8E489B, stroke-width:2px
    classDef RoleCore fill:white,stroke:#00B0D5,color:black, stroke-width:4px

Work packages in detail

WP 1

flowchart LR
    A[Work Package 1:<br>Establishment Activities]:::wp

    subgraph Activities
        A1[Recruit & appoint:<br>Project Manager<br>Community Manager<br> Technical roles]:::act
        A2[Establish committees]:::act
        A3[Project web page with DOI]:::act
        A4["ARDC’s FAIR initiation activity"]:::act
    end
    subgraph Deliverables
    D1["All roles fulfilled"]:::del
    D2["Committees established:<br>Fixed membership<br>Meeting schedule<br>Endorsed Terms of Reference"]:::del
    D3["Project web page published"]:::del
    D4["ARDC’s FAIR initiation Activity<br>completed"]:::del
    end
    A --> A1
    A --> A2
    A --> A3
    A --> A4

    A1 --> D1
    A2 --> D2
    A3 --> D3
    A4 --> D4

    Activities:::Empty
    Deliverables:::Empty
    classDef Empty fill:none,stroke:black;
    classDef wp fill:#0b6efd,color:#fff,stroke:#084298,stroke-width:2px;
    classDef act fill:#e7f1ff,color:#052c65,stroke:#9ec5fe,stroke-width:1px;
    classDef del fill:#e8f5e9,color:#1b5e20,stroke:#a5d6a7,stroke-width:1px;

February to March 2026:

  • UNSW to recruit roles + execute subcontracts
  • Everyone contributes to shape governance
  • ARDC/UNSW lead project page

April to May 2026:

  • ARDC/UNSW lead FAIR initiation

WP 2

flowchart LR
    A["Work Package 2<br>Requirements Gathering &<br>Workflow Development Planning"]:::wp

    subgraph Activities
        A1[Requirements Gathering]:::act
        A2[Implementation Plans]:::act
        A3[Two-year Workflow<br>Development Roadmap]:::act
    end
    
    SubActivities1["Functionality for key user groups<br>Detailed use cases<br>High-level requirements &<br>constraints"]:::act
    
    A2a[PID implementation plan]:::act
    A2b[FAIR4RS implementation plan]:::act


    SubActivities3["Detailed use cases<br>Priorities for Tranche 1<br>Priorities for Tranche 2<br>Review and update requirements"]:::act

    D1["Ecosystem Indicators workflow<br>development plan"]:::del
    D2["Persistent Identifiers (PID)<br>implementation plan"]:::del
    D3["FAIR for datasets &<br>research software (FAIR4RS)<br>implementation plan"]:::del
    

    %% Activity structure
    A --> A1 --> SubActivities1
    A --> A2 --> A2a & A2b
    A --> A3 --> SubActivities3

    %% Activities to Deliverables mapping
    SubActivities1 --> D1
    A2a --> D2
    A2b --> D3
    SubActivities3 --> D1

    %% Styles
    Activities:::Empty
    classDef Empty fill:none,stroke:black;
    classDef wp fill:#0b6efd,color:#fff,stroke:#084298,stroke-width:2px;
    classDef act fill:#e7f1ff,color:#052c65,stroke:#9ec5fe,stroke-width:1px;
    classDef del fill:#e8f5e9,color:#1b5e20,stroke:#a5d6a7,stroke-width:1px;

April to July 2026:

  • Core Team at UNSW lead development plan
  • QCIF to contribute
  • Input from thematic and technical experts
  • Input from potential users
  • UNSW/ARDC leading implementation plans

WP 3

flowchart LR
    A[Work Package 3<br>Data & Metadata]:::wp

    subgraph Activities
        A1[Audit vocabularies]:::act
        A2[Audit datasets &<br>data pipelines]:::act
        %%A3[FAIR assessment of<br>identified datasets]:::act
        A4[Transformation<br>& harmonisation tools]:::act
        A5[Data documentation &<br>user guide]:::act
    end
    
    SubActivities1["Global Ecosystem Typology (GET)<br>National/state classifications"]:::act
    SubActivities2["Catalogue datasets<br>Document pipelines & access <br>Record rights & licensing<br>FAIR assessment"]:::act

    SubActivities4[Reusable packaging<br>Automated harmonisation]:::act

    subgraph Deliverables
        D1["Description & publication<br>of relevant vocabularies"]:::del
        D2["Datasets & pipelines<br>documented<br>"]:::del
        D3["Packaged transformation<br>& harmonisation tools/<br>workflows operational"]:::del
        D4["Transformation/harmonisation<br>documented & user guidelines"]:::del
    end

    %% Activity structure
    A --> A1 --> SubActivities1

    A --> A2 --> SubActivities2
    %% --> A3
    A --> A4 --> SubActivities4
    A --> A5

    %% Activities to Deliverables mapping
    SubActivities1 --> D1
    SubActivities2 --> D2
    SubActivities4 --> D3

    %%A3 --> D2

    A5 --> D4
    A4 --> D4

    %% Styles
    Activities:::Empty
    Deliverables:::Empty
    classDef Empty fill:none,stroke:black;
    classDef wp fill:#0b6efd,color:#fff,stroke:#084298,stroke-width:2px;
    classDef act fill:#e7f1ff,color:#052c65,stroke:#9ec5fe,stroke-width:1px;
    classDef del fill:#e8f5e9,color:#1b5e20,stroke:#a5d6a7,stroke-width:1px;

March to April 2026:

  • UNSW and JCU work on vocabularies, other tools

April to July 2026:

  • UNSW, QCIF and JCU work on data pipelines tools

May to August 2026:

  • UNSW and QCIF documenting data pipelines

WP 4

flowchart LR
    A[Work Package 4<br>Workflow Delivery]:::wp

    subgraph Activities
        A1[Develop analysis code]:::act
        A2["Develop & test<br>workflows (incl. end users)"]:::act
        A3[Operationalise<br>platform services]:::act
        A4[Implement PID plan]:::act
        A5["Implement FAIR4RS plan<br>(FAIR4RS)"]:::act
    end

    Subactivity1[Tranche 1 functionality<br>Tranche 1 workflows]:::act
    Subactivity2[Tranche 2 functionality<br>Tranche 2 workflows]:::act
    Subactivity3[Develop operational<br>processes & procedures<br>Deploy & validate<br>on hosting platforms]:::act

    subgraph Deliverables
        D1["Delivery of 1st tranche<br>workflow functionality"]:::del
        D2["Delivery of 2nd tranche<br>workflow functionality"]:::del
        D3["Platform services processes<br> & procedures<br>operational and documented"]:::del
        D4["PID implementation plan<br>implemented"]:::del
        D5["FAIR4RS plan<br> implemented"]:::del
    end

    %% Activity structure
    A --> A1 --> Subactivity1

    A --> A2 --> Subactivity2

    A --> A3 --> Subactivity3

    A --> A4
    A --> A5

    %% Activities to Deliverables mapping
    Subactivity1 --> D1

    Subactivity2 --> D2

    Subactivity3 --> D3

    A4 --> D4
    A5 --> D5

    %% Styles
    Activities:::Empty
    Deliverables:::Empty
    classDef Empty fill:none,stroke:black;
    classDef wp fill:#0b6efd,color:#fff,stroke:#084298,stroke-width:2px;
    classDef act fill:#e7f1ff,color:#052c65,stroke:#9ec5fe,stroke-width:1px;
    classDef del fill:#e8f5e9,color:#1b5e20,stroke:#a5d6a7,stroke-width:1px;

May 2026 to November 2027

  • UNSW and QCIF work on first (2026) and second (2027) tranche of workflows
  • Supporting role from thematic experts
  • Contributions from user community
  • Contributions from potential end-users

May 2026 to December 2027

  • Platform services: UNSW and JCU with QCIF? additional partner institutions?
  • UNSW and QCIF execute implementation plans

WP 5

flowchart LR
    A[Work Package 5<br>Indicator Workflow<br>Catalogue & Dashboard]:::wp

    subgraph Activities
        A1[Requirements gathering<br>with stakeholders & end users]:::act
        A2["Design & Operationalise<br>Catalogue (MVP)"]:::act
        A3[Dashboard App for<br>Indicator Development Tracking]:::act
    end
    A1b["Identify functionality and requiremens<br>for key user groups<br>(Metadata, Integration, User interface)"]:::act
    A2a["Catalogue design<br>Build & deploy MVP"]:::act
    A3a["Design dashboard metrics<br>(views, status/coverage)<br>Build & deploy MVP"]:::act

    subgraph Deliverables
        D1["High-level requirements &<br>constraints documented"]:::del
        D2["User requirements<br>for catalogue/dashboard<br>outlined"]:::del
        D3["Catalogue design<br>documented"]:::del
        D4["Workflow catalogue<br>MVP operational"]:::del
        %%D5["User requirements<br>for dashboard outlined"]:::del
        D6["Dashboard MVP<br>operational"]:::del
    end

    %% Activity structure
    A --> A1 --> A1b
    A --> A2 --> A2a

    A --> A3 --> A3a

    %% Activities to Deliverables mapping
    A1 --> D1
    A1b --> D2

    A2a --> D3 & D4

    %%A3a --> D5
    A3a --> D6

    %% Styles
    Activities:::Empty
    Deliverables:::Empty
    classDef Empty fill:none,stroke:black;
    classDef wp fill:#0b6efd,color:#fff,stroke:#084298,stroke-width:2px;
    classDef act fill:#e7f1ff,color:#052c65,stroke:#9ec5fe,stroke-width:1px;
    classDef del fill:#e8f5e9,color:#1b5e20,stroke:#a5d6a7,stroke-width:1px;

October 2026 to February 2027:

  • UNSW, JCU and QCIF work on requirements, design
  • Input from thematic and technical experts
  • Input from potential users

March 2027 to November 2027:

  • UNSW, JCU and QCIF work on Minimum Viable Products
  • Feedback from user community and potential users

WP 6

flowchart LR
    A[Work Package 6<br>Community Building & Engagement,<br>Communication, Skills & Training]:::wp

    subgraph Activities
        A1[Develop Engagement &<br>Communications Plan]:::act
        A2[Grow the Ecosystem Indicator<br>Developer Community]:::act
        A3[Develop training &<br>user support materials]:::act
        A4[Run user workshops]:::act
        A5[Collect & describe<br>user stories]:::act
    end

    Subactivity2[Identify stakeholders<br>Define engagement plan<br>Develop communications &<br>onboarding materials<br>Run community<br>engagement activities]:::act
    Subactivity4[Train users on workflows<br>Test reproducibility<br>Publish code &<br>data outputs from workshops]:::act

    subgraph Deliverables
        D1["Communication & Engagement<br>plan developed"]:::del
        D2["User training & support<br>materials published"]:::del
        D3["User workshops delivered"]:::del
        D4["Published data & code<br>outputs from workshops"]:::del
        D5["User stories published"]:::del
        D6["Engagement & communication<br>activities executed"]:::del
    end

    %% Activity structure
    A --> A1
    A --> A2 --> Subactivity2
    A --> A3
    A --> A4 --> Subactivity4
    A --> A5

    %% Activities to Deliverables mapping
    A1 --> Subactivity2 -->D1
    A3 --> D2

    Subactivity4 --> D3 & D4

    A5 --> D5

    %% Execution of the plan
    
    Subactivity2 --> D6
    %%A3 --> D6
    %%Subactivity4 --> D6

    %% Styles
    Activities:::Empty
    Deliverables:::Empty
    classDef Empty fill:none,stroke:black;
    classDef wp fill:#0b6efd,color:#fff,stroke:#084298,stroke-width:2px;
    classDef act fill:#e7f1ff,color:#052c65,stroke:#9ec5fe,stroke-width:1px;
    classDef del fill:#e8f5e9,color:#1b5e20,stroke:#a5d6a7,stroke-width:1px;

March 2026 to December 2027:

  • UNSW and ARDC work on communication plan
  • All contribute to implement communication plan

October 2026 to April 2027:

  • UNSW, ARDC and QCIF work on training material
  • All contribute to deliver first community event

May 2026 to Dec 2027

  • UNSW, ARDC publish user stories
  • All contribute to deliver second community event

Outputs

Overview of End of Project Outputs

Code OUTPUT
EOP Output 1 Vocabularies for the Global Ecosystem Typology published in appropriate registry.
EOP Output 2 Relevant datasets assessed for FAIRness, transformed and integrated into defined use cases, with packaged tools, workflows, and user guides made available.
EOP Output 3 FAIR workflow for Ecosystem Indicators Development are integrated into existing national research infrastructure (e.g. EcoCommons).
EOP Output 4 Controlled vocabulary and ontology mapping for ecosystem types published and integrated into data ingestion workflows
EOP Output 5 Engagement activities for the community of Ecosystem Indicator developers

EOP Output 1

OUTPUT Vocabularies for the Global Ecosystem Typology published in appropriate registry.
WORK PACKAGES 3.1 Data and information foundations
INDICATOR/S * Vocabularies for the Global Ecosystem Typology published in appropriate registry.
MEASURE * Persistent identificator of the vocabulary.
DATA SOURCE/S * Web page of the vocabulary system
TIMELINE FOR DATA COLLECTION * Systemic and yearly project reports
RESPONSIBILITY UNSW
BASELINE No vocabulary currently registered

EOP Output 2

OUTPUT Relevant datasets assessed for FAIRness, transformed and integrated into defined use cases, with packaged tools, workflows, and user guides made available.
WORK PACKAGES 3.2 Data harmonisation and engineering

INDICATORS:

  • Proportion of datasets made interoperable and accessible through adoption of community-agreed standards and services.
  • Proportion of data integration efforts that are documented.
  • Research needs or translation use cases are clearly defined.
  • Infrastructure developed or enhanced during the project is documented and maintained beyond project completion.

EOP Output 2

MEASURE:

  • Datasets meeting interoperability and FAIR standards / total datasets.
  • Integration reports produced / total integration efforts.
  • List of use cases in project records.
  • Availability of documentation & sustainability plan.

Data SOURCE/S:

  • Progress dashboard tracking coverage of indicators for ecosystem types and level of compliance of FAIR principles for dataset and workflows.

EOP Output 3

OUTPUT FAIR workflow for Ecosystem Indicators Development are integrated into existing national research infrastructure (e.g. EcoCommons).
WORK PACKAGES 4. System infrastructure

INDICATORS:

  • System requirements and configuration for integration are documented.
  • FAIR workflows is accessible through the selected research infrastructure.

EOP Output 3

MEASURE:

  • Approved system requirements and configuration document. • Availability of a persistent access link (DOI, or equivalent). • Number of FAIR workflows accessible via the platform. • Number of users accessing the workflow via the platform.

Data SOURCE/S:

  • Web page of the research infraestructure.

EOP Output 4

OUTPUT Controlled vocabulary and ontology mapping for ecosystem types published and integrated into data ingestion workflows
WORK PACKAGES Activities 3.1.1, 3.2.1

INDICATORS:

  • Curated and documented lists of terms, concepts, and their mappings to standard vocabularies or ontologies

EOP Output 4

MEASURE:

• Availability of a persistent access link (DOI, or equivalent).

Data SOURCE/S:

  • Web page of the vocabulary system

EOP Output 5

OUTPUT Engagement activities for the community of Ecosystem Indicator developers
WORK PACKAGES 5. Community Building and Engagement, Skills and training

INDICATORS:

  • Engagement strategy and plan is developed.
  • Community engagement activities are hosted.
  • Feedback and recomendations for improvement are documented and incorporated for future community engagement activities.

EOP Output 5

MEASURE:

  • Engagement strategy and plan approved.

  • Number of activities conducted (e.g., workshops, hackcton).

  • Number and diversity of participants (e.g., institutions, roles, gender, age, carreer level).

  • Participant satisfaction (measured through survey).

  • Proportion of recommendations integrated into future plans/activities.

Data SOURCE/S:

  • Satisfaction surveys after each community engagement event (e.g. workshops, hakatons).
  • Project reports.

Outcomes

Overview of End of Project Outcomes

Code OUTCOME
EOP Outcome 1 Ecosystem-specific indicator development processes are simplified, streamlined, and more efficient
EOP Outcome 2 Development of ecosystem-specific indicators is accelerated through reproducible, collaborative, and scientifically rigorous methods
EOP Outcome 3 Interoperability and semantic alignment across data, tools, and workflows are strengthened through the use of shared standards and vocabularies
EOP Outcome 4 Stronger collaboration and skills sharing among end users and contributors of the FAIR workflows for Ecosystem Indicators
EOP Outcome 5 Ecosystem monitoring and management frameworks are informed by transparent, reproducible, and collaborative ecosystem-specific indicators based on rigorous scientific principles.

EOP Outcomes 1

INDICATORS:

  • Production rate of indicators under the FAIR workflows.

MEASURES:

  • Number of workflows documented as reproducible and publicly accessible.
  • Number of indicators with openly available methods, data, and metadata.

Thanks!

This presentation was prepared by José R. Ferrer-Paris and is shared under license: Attribution-ShareAlike 4.0 International (CC BY-SA 4.0)

It was created using Quarto, Mermaid, Graphviz and reveal.js.

Slides are available at:

jrfep.quarto.pub/EIW-project.

Source code available at:

github/Ecosystem-Indicators-Workflows/.

ARDC. 2025. “Environmental Indicators Initiative Co-Design Workshop 2025 Report.” Zenodo. https://doi.org/10.5281/zenodo.16956624.